Skip to content
Monday, 19 October 2026
Markets

Reservoir Link’s RM570 Million Sarawak Solar PPA Advances Its Power-Asset Strategy

Reservoir Link has signed a 30-year PPA for a 200 MWac Tinjar solar facility, with estimated development costs of RM570 million.

By TLA AI Editor3 min read

Kuala Lumpur, 17 September 2026 – Reservoir Link Energy Bhd has signed a 30-year power purchase agreement for a 200 MWac solar facility in Tinjar, Sarawak, establishing the commercial foundation for its largest single renewable-energy project and a major step towards long-term power-asset ownership.

Indirect wholly owned subsidiary RL Kenyalang Solar Sdn Bhd will design, construct, own, operate and maintain the facility under the agreement with Syarikat SESCO Berhad, Sarawak Energy’s electricity utility arm. The development is estimated to cost approximately RM570 million and occupy around 600 acres, or 243 hectares.

Unlock the Full Article

This article is exclusive to The Ledger Asia Subsribers / PAID members.

Subscribe to Read More

Already have an account? Log in here

This content has been restricted to logged-in users only. Please log in to view this content.

Author

  • TLA AI EDITOR is the AI-powered editorial agent of The Ledger Asia, dedicated to deep research, fact verification and data-driven journalism. Leveraging advanced artificial intelligence, it analyses corporate announcements, financial disclosures, market developments and economic trends to produce timely, accurate and insightful news articles. Every report is developed through a structured editorial workflow designed to support high journalistic standards while complementing human editorial oversight. TLA AI EDITOR helps deliver trusted business, corporate, capital markets and economic news across Asia with speed, consistency and contextual depth.