KUALA LUMPUR, 11 December 2025 — Shariah-compliant Wasco Greenergy Berhad (“Greenergy” or “the Company”) made its Main Market debut today, opening at RM0.95, a 5% decline from its IPO price of RM1.00 per share. The stock, listed under the name GENERGY and stock code 5343, saw active early trading as investors assessed the renewable-energy engineering group’s long-term prospects.
Bursa Malaysia Chief Executive Officer Dato’ Fad’l Mohamed noted at the ceremony that Greenergy’s listing marks the 60th and final IPO on Bursa Malaysia for 2025, capping off one of the strongest listing years in the exchange’s recent history.
A Meaningful Milestone Despite Softer Debut
Despite the softer opening, Greenergy’s entry onto the Main Market represents a significant step in the company’s evolution into a regional provider of engineered renewable-energy solutions for industrial clients across Malaysia, Indonesia and other growing economies.
Through its integrated fabrication, design and EPCC (Engineering, Procurement, Construction & Commissioning) model, the Company serves energy-intensive sectors such as palm oil, oleochemicals, paper milling, food processing and other heavy industries that rely on uninterrupted steam and power systems.
Chief Executive Officer Lee Yee Chong said the listing reflects the company’s operational strength and sustained customer trust.
“Today is a meaningful milestone for Greenergy. It reflects the dedication of our people and the trust placed in us by our customers, partners and investors,” he said.
He added that Greenergy will continue scaling its engineered steam solutions, strengthening its regional footprint, and supporting industrial clients in improving operational efficiency and emissions outcomes.
Strong Market Outlook for Engineered Steam Solutions
Industry research by Frost & Sullivan highlights a steady rise in demand for efficient engineered steam technologies across Malaysia and neighbouring markets.
The report notes:
- Palm oil, oleochemical, food-processing and paper-milling sectors require reliable steam solutions for 24/7 operations.
- Indonesia and regional markets are witnessing increased adoption of engineered steam systems due to rapid industrial expansion and tightening emissions regulations.
This creates a favourable backdrop for Greenergy’s long-term growth strategy.
RM75 Million IPO Proceeds to Fund Expansion, Asset Ownership and Digitalisation
Greenergy raised RM75.0 million in gross proceeds from the public issue. Key allocations include:
- 50.9% (RM38.2m) — Asset Ownership Programme for steam plant assets
- 7.3% (RM5.5m) — Expansion in Indonesia
- 16.7% (RM12.5m) — Upgrading equipment, machinery and HQ facilities
- 6.7% (RM5.0m) — Digitalisation including AI tools, ERP systems, and integrated monitoring
- 5.3% (RM4.0m) — R&D initiatives
- 13.1% (RM9.8m) — Listing expenses
Based on the IPO price and 500.0 million enlarged shares, Greenergy attained an initial market capitalisation of RM500.0 million.
A Growing Regional Player in Industrial Renewable-Energy Systems
Operating from its manufacturing hub in Shah Alam, Greenergy delivers complete EPCC solutions for engineered steam systems including:
- Biomass-fired boilers
- Gas-fired boilers
- Heat Recovery Steam Generators (HRSG)
- Shinko steam turbine generator systems
- Palm oil milling equipment
Its integrated engineering capabilities support clients in improving energy efficiency, reducing emissions, and upgrading industrial sustainability standards.
Capital-Market Partners
- CIMB Investment Bank Berhad — Principal Adviser, Sole MITI Coordinator & Managing Underwriter
- CIMB Investment Bank Berhad & Maybank Investment Bank Berhad — Joint Bookrunners & Joint Underwriters
- CGS International Securities Malaysia Sdn Bhd — Joint Bookrunner